Site Investigation And Preparation Construction Essay

Select any industry you know. Imagine how you will prepare the site & the periods you have to undergo. Picture the doc, the site inspection. Have you got any by-law? Follow your creativity and write a mini record. Sketch (include body) an example of a terrible site layout. Briefly explain why it is just a bad lay out.

Introduction

Nowadays, population in Penang increasing rapidly however in Penang we could less free space for development. Therefore, for reducing land space used, we will construct 20 storey building. We from NZL development has to develop a huge apartment in domestic area. This apartment includes 20 floors which cover around 3300sq. ft in Penang. To be able to start our construction, first of all we have to investigate and put together the website (SI). The actions during preparing the website are earthwork, site clearing, fencing, dewatering, staking, and build temporary infrastructure for employee and build shortcut gain access to for heavy vehicle. The engineering is referring laws of Penang.

Objective of SI

The SI needed to construct an construction that will cutting down the maximum amount of the inconvenient toward open public and area during the project operating. Besides, it s also need to make sure that the site is suited to the structure.

Site Investigation

The geological and geotechnical variables must well suited for the building. There, we should extract the dirt by using uninteresting technique. This technique acquired t produce noisy that will disturb the residents. Moreover, the technique is less expensive that will save our budget. Following the test is conducted, we have now know our geological suitable. Now, we can continue constructing the project. First of all, we should clear the website. Ex: cutting the existing tress that in site area and also demolishing old building. Next, excavating the surface for the formation level and slope stabilization

The problem encounters before and during construction

The problem may occur before development

1. A couple of small rivers in the development site.

2. Demolishing the old building bring unsatisfied among resident

3. Difficulty in carrying the materials to the development site because near the town and personal area

The solution

1. The river covers up by the garden soil from cut and fill

2. Build ideal drainage system to void flood in the site and the home area.

3. Give some repay money for the residents for his or her loses in the old building

4. In order to avoid traffic jam, disturbing the resident and also for safeness reason work having the gear and materials such as tractor, timber and other is after optimum that around 10 am to 3 pm

Problem which could faces during the construction

1. Weather of the united states is unpredictable. Its can be raining day without any sign.

2. The travelling of the raw materials is far away from the site cause the site is close to personal area.

3. Not enough space for keeping fresh materials small site area.

4. Safeness for the citizen. It s quite not security when the heavy vehicle moving the raw materials

5. The noisy sound from the engineering site will disturb the residents condition

6. Streaming of heavy vehicle will damage the road.

7. The piling will impact the ground condition that could cause unstable condition for the foundation level

The site layout

Site layout is as recommendations for a perfect development. In must smartly intend to reduce careless approximately we can. It s also to avoid delay in construction. The website layout is really as below

1. Caution notice to alert public and staff at the engineering. This is important to warn general population people and also give consciousness among the employees.

2. Briefing is needed for the workers

3. The site must secure from official people such as general public workers. So, to get more protection we need to fence around it.

4. The raw materials must be keeping systematically. If there insufficient space, we need to hire it.

5. Electricity and watering is at the website. Producing this important things must illegitimate and organized to curb problem during engineering that may hold off project

6. Facilities for the employees must considerate. Must be fully constructed with electricity and drinking water.

7. Specialist and contractor office must close by the site

Bad site layout

Bad site layout may cause easier thing to be more difficult especially when it did not plan well.

This is example of bad layout. Why we grouped it as bad layput??

1. Do not show highway those heavy vehicles need to check out by.

2. No spot to keep fresh materials

3. No fencing about the construction site

4. Too simple plan layout.

5. No welfare for the personnel such as toilets and canteen

The site layout must be clear including sketching highway, and fence. Besides, site structure also must show the complete construction. The choice street also must be recommended to avoid traffic problem and make the travelling raw materials become easier. In addition, places for keeping the recycleables must be protected up by drinking water proof to avoid it from destruction internally and externally. Besides, all the welfare for staff needs to improve time by time to provide comfortable and tidy place on their behalf. This may provide them with heart and courage those to work harder.

This site is handled by Academic Computing, Centre for Information & Communication Technology, Universiti Teknologi Malaysia

Today's Visits : 45, 796

Total Strikes : 1, 061, 804

Also We Can Offer!

Other services that we offer

If you don’t see the necessary subject, paper type, or topic in our list of available services and examples, don’t worry! We have a number of other academic disciplines to suit the needs of anyone who visits this website looking for help.

How to ...

We made your life easier with putting together a big number of articles and guidelines on how to plan and write different types of assignments (Essay, Research Paper, Dissertation etc)